top of page

Towers of Channelside

JAH was hired to solve a water intrusion issue into the garage in an aesthetically pleasing way. The solution was to provide a screening system that still allowed for ventilation to occur without the addition of an air pump. The screen system is held 18" away from the openings to meet the code requirement of ventilation. Areas where water intrusion had not been an issue previously were left open,

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

Client

Private

Year

2014

Location

Tampa, FL

Description

Share

bottom of page